
Recently, the first train of Luoyang Metro Line 1 was handed over. Type B train is adopted, each train is composed of six cars, with a design speed of 80km / h, a fixed capacity of 1460 people and a maximum passenger capacity of 2062. CRRC times electric provides the core traction electric drive system, auxiliary power supply system and network control system for Luoyang Metro Line 1 project.
